Tag: <span>Tour</span>

Clock from the old Library

Inside Moseley Road Baths and Library

I’ve been waiting a long time to get back inside Moseley Road Baths and Library, so when the opportunity to visit came up, I jumped at the chance. It is fantastic to see the space coming together, with several parts already feeling close to finished. Joe Holyoak had, as part of his outstanding commitment to Balsall Heath, been writing updates on the Baths for us (see bottom of the page).

Library nearly there

According to the builders, the Library should be ready by Spring 2027, with the Baths following a year or so later. Balsall Heath Local History Society has also been playing its part, looking after the Library’s original clock, waiting for the day it can return home.

We started our tour in the main foyer. The historic kiosk is carefully wrapped up right where it belongs, and the skylight above has been cleaned, insulated, reinforced, and made leak-proof. It looks just as I imagine it did before it’s first day in 1907 – the Library had actually already opened in 1895.

From there, we were led through a short connecting corridor into the Library. The exposed sections of the classic herringbone flooring looked a little worn, though we were assured it will soon be fitted back into place. Later in the tour, we actually spotted the rest of the parquet safely stored in the Men’s Slipper Baths, a space that will soon be transformed into a new gym.

Careful restoration continues

As Simon Piaia from the National Trust explained, balancing modern usability with conservation takes careful thought:

“Purely because of acoustics, there will be carpet. It was going to be too bouncy to leave it exposed, but the heritage is really important, so we’re making sure we keep all of it. It will remain underneath, and the carpet will be positioned so you can pull it back fairly easily. Should they want to expose more of the parquet flooring in the future, they can.”

The level of detail in the heritage preservation is genuinely impressive. Looking up, we could see the finishing touches being applied to the balcony, bringing into focus the beautiful plasterwork and exposed timber that will soon frame a quieter reading area for the Library upstairs, above the bustle of a busy community library downstairs.

Time is nearly ticking

Clocktower nearly ready
Clocktower nearly ready
Clock waiting only waiting to be wound up now.
Clock only waiting to be wound up now.

Finally, we headed up onto the roof. From the street you can’t fully appreciate the beautiful terracota work the complexity of the job and the now beautifully cleaned, restored, leakproof roof. I had hoped to catch a glimpse of the newly renovated clock. We couldn’t quite see it during the tour, though it has since been revealed for all to see! Each time a change has happened it is noted on the walls of the Clocktower, like the short note to say it was stopped during World War Two. Our guide shared a few details about its restoration:

“It’s all been restored, including the clock face. It’s electrically run now, though the original mechanics are still working too, so it just needs wiring in and we’re ready to go. There was actually a record written on the wall of all the past repair work—we’ve still got the old repair logbook stored somewhere as well. And on the walls, past workers had left their own notes, including a lot of graffiti about Blues and Villa. For some reason, there must have been a little argument going on up there!”

To find out more visit Friends of Moseley Road Baths.